OVERVIEW
The project was divided into two stages. In the first stage, the roof of the B building was dismantled and a new office floor was raised, then the roof was rebuilt. A similar procedure was followed at the second stage, for the A building, but there were raised two floors: one with a new production unit that doubles the factory capacity and the other, a technical floor for placing the equipment that serves this section.